Apple Hotel



Apple Hotel (click for a larger view)

by:

Rubicon Consultancy
Financial Engineering


General description

The Apple Resort Hotel was developed as a three star resort compound erected in a site area of 72,895 square meters, has 117 rooms in existing development and will be 200 rooms in the future. As of our inspection date (18th of January 1993), the site improvements works were currently under construction.

Location

Apple Hotel (click for a larger view)
Fronting road Jalan Raya Baty - Malang

The Apple Resort Hotel is located in the main stream of Jalan Raya Malang - Batu with beautiful surroundings view and only two (2) kilometers before the famous apple-town Batu.

It is about twenty (20) minutes drive from Malang or 1,5 hours from Juanda Airport, Surabaya.

Fronting Road

The fronting road is a main road which connecting Malang to Batu, asphalted and is about ten (10) meters wide.

Apple Hotel (click for a larger view)
Front section of the property as seen from the entrance gate
Apple Hotel (click for a larger view)
North view of hotel building (under construction)

Surrounding Properties

The surrounding properties comprise generally Kampung houses, villas and paddy fields. Batu is about 900 meters above the sea level is well-known resort area in East Java since this town is surrounded by very beautiful view of mountains and the place for many kinds of fruit, vegetable, flower and bonsai plantations. Some of the three stars resort hotels in Batu area are:

Purnama Hotel - 142 rooms Kartika Wijaya Hotel - 66 rooms.

Apple Hotel (click for a larger view)
East view of hotel building

Construction and accommodation

These comprise three (3) connecting buildings with the following construction details:

1.1 Main Building  
  Structure Two store building of reinforced concrete framed construction with bored pile foudation and provided by lagoon at the front section.
  Roof Ceramic tiles on steel frames.
  Walls Mainly open elevations and partly with plastered brick in fills.
  Floors Solid concrete mainly surfaced by local marble tiles and are partly not yet surfaced.
  Ceilings Timber framed hanger only.
  Partitions Plastered brick walls.
  Windows Timber framed only.
  Doors Solid timber.
  Stairs Spiral type of reinforced concrete framed and surfaced by local marble tiles.
  Accomodation  
  Semi Basement Office, exhibition area, a small meeting room, discotheque, lockers, Restaurant, main kitchen, coffee shop, shopping arcade and fitness center.
  Ground Floor Main entrance, lobby area, separately convention room, sunken lounge and games room.
1.2 Wing A and B  
  Structure Wing A of two stores and Wing B of three-store building of reinforced Concrete framed construction with bored pile foundation.
  Roof Ceramic tiles on timber frames.
  Walls Plastered brick in fills.
  Floors Solid concrete surfaced by local marble tiles to the corridor and ceramic tiles to all bedrooms.
  Ceilings Gypsum boards.
  Partitions Plastered brick walls.
  Windows Timber framed only.
  Stairs Spiral type of reinforced concrete framed surfaced by marble tiles.
  Bathrooms Walls and floors are surfaced by ceramic tiles and provided by standard "Toto"sanitary equipment.
  Accomodation  
  Wing A Each floor consists of lounge, 22 standard rooms and 2 suites.
  Wing B Each floor consists of lounge, 20 standard rooms and 3 suites.
     
Apple Hotel (click for a larger view)
Rear section of the property

Building area

The gross building area is as follows:
1.1 Main Building    
  Semi basement 3.300 m2  
  Ground Floor 3.000 m2 +/+

 
      6.300 m2

1.3 Wing A    
  Ground Floor 1.500 m2  
  First Floor 1.500 m2 +/+

 
      3.000 m2

1.4 Wing B    
  Semi Basement 1.500 m2  
  Ground Floor 1.500 m2  
  First Floor 1.500 m2 +/+

 
      4.500 m2 +/+

  Total   13.800 m2



Apple Hotel (click for a larger view)
Main building - under construction
Apple Hotel (click for a larger view)
Corridor to the wing - under construction

State of condition and repair

The average completed portions of construction are about 85%.

The Site

1.1 Shape and Area

The site is irregular in shape with the frontage, which is approximately 50 meters and the total site area is 72.985 m2.

1.2 Topography

The site is undulating with the rear section is higher than the front section.

 

___________________________________________________________
Burg WebdEsigN
Deze site is geoptimaliseerd voor 4.0 browsers of hoger
bij een schermresolutie van 800x600
design © Burg WebdEsigN

home
Archive Assigned Projects
  • Hotel Rubicon
  • Apple Hotel
  • slideshow
  • Bali Cliff Resort
  • Project Development
  • Marina Baltimore, Ierland
  • Sunco Transceivers
  • contact opnemen